EconPapers    
Economics at your fingertips  
 

Single-machine scheduling of multi-operation jobs without missing operations to minimize the total completion time

T.C.E. Cheng, C.T. Ng and J.J. Yuan

European Journal of Operational Research, 2008, vol. 191, issue 2, pages 320-331

Abstract: We consider the problem of scheduling multi-operation jobs on a singe machine to minimize the total completion time. Each job consists of several operations that belong to different families. In a schedule each family of job operations may be processed as batches with each batch incurring a set-up time. A job is completed when all of its operations have been processed. We first show that the problem is strongly NP-hard even when the set-up times are common and each operation is not missing. When the operations have identical processing times and either the maximum set-up time is sufficiently small or the minimum set-up time is sufficiently large, the problem can be solved in polynomial time. We then consider the problem under the job-batch restriction in which the operations of each batch is partitioned into operation batches according to a partition of the jobs. We show that this case of the problem can be solved in polynomial time under a certain condition.

Downloads: (external link)
http://www.sciencedi ... d593637a6f247c4bdc17
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Access Statistics for this article

European Journal of Operational Research is edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Series data maintained by Heidi Boesdal ().

 
Page updated 2008-07-06
Handle: RePEc:eee:ejores:v:191:y:2008:i:2:p:320-331