EconPapers    
Economics at your fingertips  
 

A discrete particle swarm optimization for lot-streaming flowshop scheduling problem

Tseng, Chao-Tang and Liao, Ching-Jong

European Journal of Operational Research, 2008, vol. 191, issue 2, pages 360-373

Abstract: We consider an n-job, m-machine lot-streaming problem in a flowshop with equal-size sublots where the objective is to minimize the total weighted earliness and tardiness. To solve this problem, we first propose a so-called net benefit of movement (NBM) algorithm, which is much more efficient than the existing linear programming model for obtaining the optimal starting and completion times of sublots for a given job sequence. A new discrete particle swarm optimization (DPSO) algorithm incorporating the NBM algorithm is then developed to search for the best sequence. The new DPSO improves the existing DPSO by introducing an inheritance scheme, inspired by a genetic algorithm, into particles construction. To verify the proposed DPSO algorithm, comparisons with the existing DPSO algorithm and a hybrid genetic algorithm (HGA) are made. Computational results show that the proposed DPSO algorithm with a two-point inheritance scheme is very competitive for the lot-streaming flowshop scheduling problem.

Downloads: (external link)
http://www.sciencedi ... a27be1533d29213d18f1
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Access Statistics for this article

European Journal of Operational Research is edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Series data maintained by Heidi Boesdal ().

 
Page updated 2008-07-06
Handle: RePEc:eee:ejores:v:191:y:2008:i:2:p:360-373