EconPapers    
Economics at your fingertips  
 

Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing

Ruud Teunter, Konstantinos Kaparis and Ou Tang

European Journal of Operational Research, 2008, vol. 191, issue 3, pages 1241-1253

Abstract: We study the economic lot scheduling problem with two production sources, manufacturing and remanufacturing, for which operations are performed on separate, dedicated lines. We develop an exact algorithm for finding the optimal common-cycle-time policy. The algorithm combines a search for the optimal cycle time with a mixed integer programming (MIP) formulation of the problem given a fixed cycle time. Using case study data from an auto part producer, we perform a sensitivity study on the effects of key problem parameters such as demand rates and return fractions. Furthermore, by comparing to results in Tang and Teunter [Tang, O., Teunter, R.H., 2006. Economic lot scheduling problem with returns. Production and Operations Management] for the situation where all operations are performed on the same line, we analyze the cost benefits of using dedicated lines.

Downloads: (external link)
http://www.sciencedi ... 15dd8dbe651154b7d837
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Access Statistics for this article

European Journal of Operational Research is edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Series data maintained by Heidi Boesdal ().

 
Page updated 2008-07-06
Handle: RePEc:eee:ejores:v:191:y:2008:i:3:p:1241-1253