Why is Brazil enriching uranium?

Cabrera-Palmer, Belkis and Geoffrey Rothwell ()

Energy Policy, 2008, vol. 36, issue 7, pages 2570-2577

Abstract: In Brazil construction began in 1971 on Angra 1, a 626Â MW Westinghouse pressurized water reactor (PWR). It was completed in 1984. Later, Angra 2 (a Kraftwerk Union PWR) achieved commercial operation in 2000. Brazil is considering the construction of seven nuclear power plants over the next 15 years. In preparation for this nuclear industry expansion, Brazil is building a uranium enrichment facility to provide nuclear fuel for Angra 1 and 2 starting in 2010 at Resende in the state of Rio de Janeiro, and collated with nuclear fuel fabrication facilities. This paper investigates whether the Resende Enrichment Facility will be able to provide uranium enrichment services at a cost lower than the international market price. We find that while Brazil is unlikely to be internationally competitive in the enrichment market, the Resende Enrichment Facility completes the front end of Brazil's nuclear fuel cycle. This assures uninterrupted nuclear fuel to its currently operating light water reactors, while providing the option of expanding capacity, lowering cost, and competing in the international nuclear fuel market after 2020.

Date: 2008

Downloads: (external link)
http://www.sciencedirect.com/science/article/B6V2W ... cc09a7e21b9ae70fe227
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: http://EconPapers.repec.org/RePEc:eee:enepol:v:36:y:2008:i:7:p:2570-2577

Access Statistics for this article

Energy Policy is edited by N. France

More articles in Energy Policy from Elsevier
Series data maintained by Heidi Boesdal ().

 
Page updated 2009-11-23
Handle: RePEc:eee:enepol:v:36:y:2008:i:7:p:2570-2577