EconPapers    
Economics at your fingertips  
 

Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns

Ou Tang and Robert W. Grubbstrom

International Journal of Production Economics, 2005, vol. 93-94, issue 1, pages 285-300

Date: 2005
View citations in EconPapers

Downloads: (external link)
http://www.sciencedirect.com/science/article/B6VF8 ... 73715c56771ea3274aed
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: http://EconPapers.repec.org/RePEc:eee:proeco:v:93-94:y:2005:i:1:p:285-300

Access Statistics for this article

International Journal of Production Economics is edited by R. W. Grubbström

More articles in International Journal of Production Economics from Elsevier
Series data maintained by Heidi Boesdal ().

 
Page updated 2009-11-24
Handle: RePEc:eee:proeco:v:93-94:y:2005:i:1:p:285-300