Abstract:
This paper seeks to bridge the gap between economists focused on designing competitive market mechanisms and engineers focused on the physical attributes and engineering requirements they perceive as being needed for operating a reliable electric power system. The paper starts by deriving the (second-best) optimal prices and investment program when there are price-insensitive retail consumers, but when their load serving entities can choose any level of rationing they prefer contingent on real time prices. It then examines the assumptions required for a competitive wholesale and retail market to achieve this optimal price and investment program. The paper analyses the implications of relaxing several of these assumptions. First, it analyzes the interrelationships between regulator-imposed price caps and capacity obligations. It goes on to explore the implications of potential network collapses, the concomitant need for operating reserve requirements and whether market prices will provide incentives for investments consistent with these reserve requirements.
Downloads: (external link) http://www.cepr.org/pubs/dps/DP6121.asp (application/pdf)
CEPR Discussion Papers are free to download for our researchers, subscribers and members. If you fall into one of these categories but have trouble downloading our papers, please contact us at subscribers@cepr.org
More papers in CEPR Discussion Papers from C.E.P.R. Discussion Papers Address: Centre for Economic Policy Research, 53--56 Great Sutton Street, London EC1V 0DG Series data maintained by ().
This site is part of RePEc
and all the data displayed here is part of the RePEc data set.
Is your work missing from RePEc? Here is how to
contribute.
Questions or problems? Check the EconPapers FAQ or send mail to .