EconPapers    
Economics at your fingertips  
 

Some considerations of the construction contract

Daniela Ciochina ()
Additional contact information
Daniela Ciochina: "Dimitrie Cantemir" Christian University

Social-Economic Debates, 2015, vol. 4, issue 1, 1-4

Abstract: Considering the provisions of Law 50/1991, which ranks as the construction works, works for which is necessary to obtain the building permit or the work for which such authorization is required, we believe that once the civil code have this legal definition of entrepreneurship, special leave out the general framework governed by the civil code of all construction work for which no building permit is required. We consider inadequate qualifications for closely related works (even if it is not necessary to obtain a building permit), subject to a simple contractors for works or services.

Keywords: Work in construction; building permit; beneficiary; reception work; contractual liability (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations Track citations by RSS feed

Downloads: (external link)
http://www.economic-debates.ro/2015/art1nr-1-2015.pdf (application/pdf)
http://www.economic-debates.ro/2015/art1nr-1-2015.pdf (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:sdb:social:v:4:y:2015:i:1:p:1-4

Access Statistics for this article

Social-Economic Debates is currently edited by Cristina Balaceanu

More articles in Social-Economic Debates from Association for Entreprenorial Spirit Promotion
Series data maintained by Adi Sava ().

 
Page updated 2017-09-29
Handle: RePEc:sdb:social:v:4:y:2015:i:1:p:1-4