Determining the optimal moment for replacing equipment
Eleodor Popescu
MPRA Paper from University Library of Munich, Germany
Abstract:
In the present work I tried to reach two main objectives. The first consists in determining whether the theoretical methods regarding the ascertainment of the optimal moment of replacement can be used as tools in adopting a decision of replacement and upgrade of fixed mechanisms in a company. The second objective is to support those investors or managers who, having a technological professional educational background, do not have the possibility to finish studies in the economic field, with emphasis on the information and working techniques necessary for adopting and implementing a development investment decision. Many times the most efficient technical or high-performing solutions, proposed by engineers, do not provide the best solutions or financial effects, determined by economists. That is why there are often contradictions or even conflicts between the approach method and that of putting into practice the company’s activities, especially investments.
Keywords: Investments; development investments; fixed mechanisms; operating period; efficiency; optimal replacement moment; modernized plant; update coefficient. (search for similar items in EconPapers)
JEL-codes: D2 (search for similar items in EconPapers)
Date: 2011-06-09
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://mpra.ub.uni-muenchen.de/31720/1/MPRA_paper_31720.pdf original version (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pra:mprapa:31720
Access Statistics for this paper
More papers in MPRA Paper from University Library of Munich, Germany Ludwigstraße 33, D-80539 Munich, Germany. Contact information at EDIRC.
Bibliographic data for series maintained by Joachim Winter ().