Improve the Economics of your Capital Project by Finding its True Cost of Capital
Tom Schmal
MPRA Paper from University Library of Munich, Germany
Abstract:
Evaluating the risk behind capital projects can be one of management’s toughest calls. One reason is project risks are presented subjectively or as a metric without a practical relationship to return. The author addresses the problem by using a Monte Carlo simulation to find a project’s risk and uses that metric to find the project’s cost of capital. In this system, risk is determined by variation in free cash flow. Since every project in your company’s pipeline will have a free cash flow, every project, including those with financial leverage, can be evaluated using the same economic yardstick. Other benefits include better value projects, better presentation and accurate discount rates for NPV.
Keywords: cost of capital; IRR; NPV; cash flow; Monte Carlo; capital project economics; risk-adjusted return; M-P5; variability; pure play; leverage; hurdle rate. (search for similar items in EconPapers)
JEL-codes: D81 G32 (search for similar items in EconPapers)
Date: 2015-11-26
New Economics Papers: this item is included in nep-cfn, nep-hpe and nep-ppm
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://mpra.ub.uni-muenchen.de/68092/1/MPRA_paper_68092.pdf original version (application/pdf)
Related works:
Working Paper: For the Pure-Play Firm: Find the True Cost of Capital for Your Capital Projects (2015) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pra:mprapa:68092
Access Statistics for this paper
More papers in MPRA Paper from University Library of Munich, Germany Ludwigstraße 33, D-80539 Munich, Germany. Contact information at EDIRC.
Bibliographic data for series maintained by Joachim Winter ().