EconPapers    
Economics at your fingertips  
 

PROBLEMS OF MANAGEMENT OF PUBLIC-PRIVATE PARTNERSHIPS

Umar Burkhanov () and Tulkin Atamuradov ()
Additional contact information
Umar Burkhanov: Tashkent State Economic University
Tulkin Atamuradov: Tashkent State Economic University

CBU International Conference Proceedings, 2013, vol. 1, issue 0, 104-109

Abstract: The paper provides the results of an empirical study of evaluation of the efficiency of public and private sectors in provision infrastructure services. The imperative research and comparative analysis methods used, revealed a number of “bottlenecks”, including gaps in the legislation and institutional restrictions, lack of experience in cooperation between state and private enterprises, deficiencies in public procurement procedures and executing PPP contracts. The results allow concluding of the significant potential and viability of PPP model in the conditions of Uzbekistan.

Keywords: public-private partnerships; double deficiency; institutional adjustments (search for similar items in EconPapers)
JEL-codes: H20 H25 (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:

Downloads: (external link)
https://ojs.journals.cz/index.php/CBUIC/article/view/21/24 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:aad:iseicj:v:1:y:2013:i:0:p:104-109

DOI: 10.12955/cbup.v1.21

Access Statistics for this article

More articles in CBU International Conference Proceedings from ISE Research Institute
Bibliographic data for series maintained by Petr Hájek ().

 
Page updated 2025-03-19
Handle: RePEc:aad:iseicj:v:1:y:2013:i:0:p:104-109