METHODS OF FINANCING AND PRICING OF DEVELOPMENT - DESIGN DEVELOPMENT OF AERONAUTICAL ENGINEERING DEFENSE
V. P. Panagushin () and
V. Y. Ivanisov ()
Strategic decisions and risk management, 2015, issue 2
Abstract:
The evaluation of the cost of development - development (R & D) at the conclusion of the state contract is proposed to conduct an estimated price of the replacement steps of the current standard OCD OCD stages, which are adequate and include several stages. At each stage, the limit is determined by the estimated price of the ROC, while retail prices are determined by the following steps and stages of their amount. Upon completion of all stages of the ROC, it is converted indicative price stages and the ROC in the fixed-price into the cost to the planned profit.
Date: 2015
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.jsdrm.ru/jour/article/viewFile/460/448 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:abw:journl:y:2015:id:460
DOI: 10.17747/2078-8886-2015-2-2
Access Statistics for this article
More articles in Strategic decisions and risk management from Real Economy Publishing House
Bibliographic data for series maintained by ООО Ð˜Ð·Ð´Ð°Ñ‚ÐµÐ»ÑŒÑ ÐºÐ¸Ð¹ дом Â«Ð ÐµÐ°Ð»ÑŒÐ½Ð°Ñ Ñ ÐºÐ¾Ð½Ð¾Ð¼Ð¸ÐºÐ°Â» ().