The Cost of Finance and the Cost of Carbon: A Case Study of Britain's only PWR
David Newbery
Economics of Energy & Environmental Policy, 2021, vol. Volume 10, issue Number 2
Abstract:
This paper argues that the cost of decarbonising depends critically on the Weighted Average Cost of Capital (WACC), illustrated with a case study of Sizewell B (SZB, the nuclear station commissioned in 1995). It calculates the cost per tonne of CO2 abated with prices set as for transmission assets by the regulator under the Regulatory Asset Base model. The cost depends critically on the WACC set in comparable utility price controls. At a low WACC the cost is £201936.2/tonne CO2 abated and £201943.3/t. CO2 at the high WACC, compared with the roughly £40/t. CO2 paid by GB generators in 2019. Moving from the social discount rate of 2.5% to a hurdle rate of 8% increases the cost from £1520/t. to over £60/t. Had Britain continued building replicas of SZB the cost saving compared to the current programme might be £2019919 billion.
JEL-codes: F0 (search for similar items in EconPapers)
Date: 2021
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.iaee.org/en/publications/eeeparticle.aspx?id=388 (text/html)
Access to full text is restricted to IAEE members and subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:aen:eeepjl:eeep10-2-newbery
Ordering information: This journal article can be ordered from
http://www.iaee.org/ ... ons/eeepjournal.aspx
Access Statistics for this article
More articles in Economics of Energy & Environmental Policy from International Association for Energy Economics Contact information at EDIRC.
Bibliographic data for series maintained by David Williams ().