The Impact of Nuclear Power Plant Construction Activity on the Electric Utility Industry's Cost of Capital

Keith Berry and Samuel Loudenslager

The Energy Journal, 1987, vol. Volume 8, issue Number 2, 63-75

Abstract: All across the United States, electric utilities are now faced with the prospect of prematurely abandoning partially completed nuclear units. While there are many reasons for this dilemma,[ the ratemaking implications are profound. They force regulators to make the unsavory decision as to the appropriate allocation of the fixed costs sunk in the abandoned projects between ratepayers and stockholders.' If a significant number of these plants are abandoned, the dollars at stake (estimated to be as large as $66 billion') in any ratemaking division of accountability are staggering.

JEL-codes: F0 (search for similar items in EconPapers)
Date: 1987
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.iaee.org/en/publications/ejarticle.aspx?id=1825 (text/html)
Access to full text is restricted to IAEE members and subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:aen:journl:1987v08-02-a05

Ordering information: This journal article can be ordered from
http://www.iaee.org/en/publications/ejsearch.aspx

Access Statistics for this article

More articles in The Energy Journal from International Association for Energy Economics Contact information at EDIRC.
Bibliographic data for series maintained by David Williams ().

 
Page updated 2025-03-19
Handle: RePEc:aen:journl:1987v08-02-a05