EconPapers    
Economics at your fingertips  
 

The Efficient Design of Contracts To Purchase Cogenerated Powers

Edward C Hall and John E. Parsons

The Energy Journal, 1990, vol. Volume 11, issue Number 2, 105-116

Abstract: This paper analyzes long-term power purchase contracts between an electric utility and a cogenerating facility and suggests ways to improve them. It discusses the best way to construct the contract payment structure in light of the given avoided cost structure; analyzing in detail the harmful incentives to low maintenance and how to avoid them. The paper concludes that the method it describes can be used to aid in the better design of contract provisions that will remedy the problem of incentives to low maintenance.

JEL-codes: F0 (search for similar items in EconPapers)
Date: 1990
References: Add references at CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://www.iaee.org/en/publications/ejarticle.aspx?id=2005 (text/html)
Access to full text is restricted to IAEE members and subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:aen:journl:1990v11-02-a06

Ordering information: This journal article can be ordered from
http://www.iaee.org/en/publications/ejsearch.aspx

Access Statistics for this article

More articles in The Energy Journal from International Association for Energy Economics Contact information at EDIRC.
Bibliographic data for series maintained by David Williams ().

 
Page updated 2025-03-19
Handle: RePEc:aen:journl:1990v11-02-a06