Chapter 5 - State Regulation of Decommissioning Costs

Peter M. Strauss and James Kelsey

The Energy Journal, 1991, vol. Volume 12, issue Special Issue, 55-72

Abstract: Even though the NRC has jurisdiction over setting regulations governing financial assurance for decommissioning, the states have the specific responsibility of setting rates for fund accumulation. Each state must include many factors in determining the appropriateness of the rate requests from the utility companies under this jurisdiction, including plant size, date of decommissioning, and configuration of the nuclear component (single or multiple units). It also must decide on proper contingency factors, estimation methodology, the likelihood of early retirement, and whether fund accumulations will include amounts for the removal of nonradioactive components and site restoration. In this chapter the authors discuss the results of their survey of how 37 state utility commissions treat these factors.

JEL-codes: F0 (search for similar items in EconPapers)
Date: 1991
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.iaee.org/en/publications/ejarticle.aspx?id=990 (text/html)
Access to full text is restricted to IAEE members and subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:aen:journl:1991si-a05

Ordering information: This journal article can be ordered from
http://www.iaee.org/en/publications/ejsearch.aspx

Access Statistics for this article

More articles in The Energy Journal from International Association for Energy Economics Contact information at EDIRC.
Bibliographic data for series maintained by David Williams ().

 
Page updated 2025-03-19
Handle: RePEc:aen:journl:1991si-a05