Abstract:
One of the standard practices in estimating costs for new procedures is to apply past experience. In this chapter, Robin Cantor uses prudency hearings and other data from power plant construction to illuminate some of the pitfalls likely to be encountered in preparing estimates for power plant decommissioning. Two of the most tempting pitfalls are scale and learning economies. She suggests that these presumed economies have had less impact on keeping construction costs down than expected, and that they also are unlikely to have much effect on decommissioning costs. Ignoring such evidence, she suggests, could result in decommissioning cost estimates that are too low and collection strategies that are inadequate. This finding has implications for future generations and future decommissioning options.
JEL-codes: F0 (search for similar items in EconPapers)
Date: 1991
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.iaee.org/en/publications/ejarticle.aspx?id=993 (text/html)
Access to full text is restricted to IAEE members and subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:aen:journl:1991si-a08
Ordering information: This journal article can be ordered from
http://www.iaee.org/en/publications/ejsearch.aspx
Access Statistics for this article
More articles in The Energy Journal from International Association for Energy Economics Contact information at EDIRC.
Bibliographic data for series maintained by David Williams ().