The Cost Structure of Regional Transmission Organizations
Daniel Greenfield and
John Kwoka
The Energy Journal, 2011, vol. Volume 32, issue Number 4, 159-182
Abstract:
RTOs now cover well over one-half of customers and sales of electricity in the U.S. As they have expanded in geographic coverage and functional scope, controversies have arisen about their rapidly growing costs and overall effectiveness. We model their costs, exploiting the fact that the seven existing RTOs initiated their various functions at different points in time over their roughly ten-year history. Specifically, we investigate the costs of each of the market functions administered by RTOs, the relative costliness of different RTOs in performing the same functions, the possibility of learning economies from either their individual or industry-wide experience, and economies of scale over the sampled range of RTO "output." Our results confirm the importance of some of these factors but raise doubts about others, in all cases based on systematic modeling and data analysis.
JEL-codes: F0 (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations: View citations in EconPapers (7)
Downloads: (external link)
http://www.iaee.org/en/publications/ejarticle.aspx?id=2440 (text/html)
Access to full text is restricted to IAEE members and subscribers. bers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:aen:journl:32-4-a07
Ordering information: This journal article can be ordered from
http://www.iaee.org/en/publications/ejsearch.aspx
Access Statistics for this article
More articles in The Energy Journal from International Association for Energy Economics Contact information at EDIRC.
Bibliographic data for series maintained by David Williams ().