Investment vs. Refurbishment: Examining Capacity Payment Mechanisms Using Stochastic Mixed Complementarity Problems
Muireann A. Lynch and Mel T. Devine
Authors registered in the RePEc Author Service: Muireann Áine Lynch
The Energy Journal, 2017, vol. Volume 38, issue Number 2
Abstract:
Capacity remuneration mechanisms exist in many electricity markets. Capacity mechanism designs do not explicitly consider the effects of refurbishment of existing generation units in order to increase their reliability. This paper presents a stochastic mixed complementarity problem to examine the impact of refurbishment on electricity prices and generation investment. Capacity payments are found to increase reliability when refurbishment is not possible, while capacity payments and reliability options yield similar results when refurbishment is possible. Final costs to consumers are similar under the two mechanisms with the exception of the initial case of overcapacity.
JEL-codes: F0 (search for similar items in EconPapers)
Date: 2017
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (16)
Downloads: (external link)
http://www.iaee.org/en/publications/ejarticle.aspx?id=2876 (text/html)
Access to full text is restricted to IAEE members and subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:aen:journl:ej38-2-lynch
Ordering information: This journal article can be ordered from
http://www.iaee.org/en/publications/ejsearch.aspx
Access Statistics for this article
More articles in The Energy Journal from International Association for Energy Economics Contact information at EDIRC.
Bibliographic data for series maintained by David Williams ().