EconPapers    
Economics at your fingertips  
 

The Other Renewable: Hydropower Upgrades and Renewable Portfolio Standards

Stein-Erik Fleten, Johannes Mauritzen, and Carl J. Ullrich
Authors registered in the RePEc Author Service: Johannes Mauritzen () and Stein-Erik Fleten

The Energy Journal, 2018, vol. Volume 39, issue Number 2

Abstract: A total of 29 U.S. states and the District of Columbia have in place mandatory Renewable Portfolio Standards (RPS) which require that a minimum amount of energy come from renewable resources. We investigate the role of hydropower vis-a-vis other renewables under RPS. Using a Bayesian multilevel model, we find that hydropower plants subject to RPS are more likely to plan upgrades. These planned upgrades appear to be a substitute for solar and wind rather than complementary reserve generation.

JEL-codes: F0 (search for similar items in EconPapers)
Date: 2018
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.iaee.org/en/publications/ejarticle.aspx?id=3058 (text/html)
Access to full text is restricted to IAEE members and subscribers.

Related works:
Journal Article: The Other Renewable: Hydropower Upgrades and Renewable Portfolio Standards (2018) Downloads
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:aen:journl:ej39-2-mauritzen

Ordering information: This journal article can be ordered from
http://www.iaee.org/en/publications/ejsearch.aspx

Access Statistics for this article

More articles in The Energy Journal from International Association for Energy Economics Contact information at EDIRC.
Bibliographic data for series maintained by David Williams ().

 
Page updated 2025-03-19
Handle: RePEc:aen:journl:ej39-2-mauritzen