Tender for Gas Power Plant
Borivoje B. Prokopovic,
Milorad N. Mircic and
Dragana Djuric
Ekonomika, Journal for Economic Theory and Practice and Social Issues, 2011, vol. 57, issue 4
Abstract:
“South stream” gas line is an investment of the century for all those who believe in the brighter energy future. Niš and the citizens of South Serbia expect that the future of the entire Serbia will be achieved when the pipeline enters Dimitrovgrad, Gas power plant is built and Gas Center Niš is built. This route of the pipeline is completely economically justified. Estimates are based on facts that the project, above all else, is motivated by careful calculations and long-term predictions of energetic demand in Europe and in Serbia.
Keywords: Resource/Energy; Economics; and; Policy (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations:
Downloads: (external link)
https://ageconsearch.umn.edu/record/289245/files/4-2011%20pages%2076-80.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ags:sereko:289245
DOI: 10.22004/ag.econ.289245
Access Statistics for this article
More articles in Ekonomika, Journal for Economic Theory and Practice and Social Issues from Society of Economists Ekonomika, Nis, Serbia
Bibliographic data for series maintained by AgEcon Search ().