BENEFIT-COST ANALYSIS OF NORTH DAKOTA'S GARRISON DIVERSON UNIT: A CASE STUDY OF CONFLICTING INTEREST
George H. Pfeiffer
Western Journal of Agricultural Economics, 1978, vol. 03, issue 2, 8
Abstract:
Federal agencies are generally required to justify the economic value of proposed water resources development projects with benefit-cost analyses. Responsibility for economic analyses lies principally with the proposing agency, under broad policies and procedures guidelines. The economic evaluation of the Garrison Diversion Unit in North Dakota was used as a case study to examine the ability of federal agencies to evaluate their own projects. A consistent tendency to overestimate project benefits and underestimate project costs was found. Revised benefit-cost ratios ranged from 0.44 to 1 to 0.77 to 1, depending on the discount rate employed.
Keywords: Resource/Energy; Economics; and; Policy (search for similar items in EconPapers)
Date: 1978
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://ageconsearch.umn.edu/record/32565/files/03020225.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ags:wjagec:32565
DOI: 10.22004/ag.econ.32565
Access Statistics for this article
More articles in Western Journal of Agricultural Economics from Western Agricultural Economics Association Contact information at EDIRC.
Bibliographic data for series maintained by AgEcon Search ().