Project Risk Management Based on WBS-RBSOBS and ANP -with the Aerospace Industry as Example
Meng-Hua Li,
Jen-Teng Tsai,
Chayun Perng and
Meng-Hua Li
Additional contact information
Meng-Hua Li: National Formosa University, Yunlin, Taiwan, ROC
Jen-Teng Tsai: Tunghai University, Taichung, Taiwan, ROC.2
Chayun Perng: National Formosa University, Yunlin, Taiwan, ROC
Meng-Hua Li: National Formosa University, Yunlin, Taiwan, ROC
International Journal of Technology and Engineering Studies, 2015, vol. 1, issue 4, 136-142
Abstract:
With the rapid development of science, projects have increasingly become complicated. Due to the availability of resources, the changing environment, and other factors, projects have become large and complicated, and corresponding single project management has gradually tended to multi-project management. Optimal time duration, minimum cost, and best quality are the expected results of project management. However, there are many uncertainties and risks under large project management, which usually result in huge losses and social impact. Therefore, project risk management is increasingly important. Previous studies on project risk management only focused on the application of a combined matrix of WBS and RBS, while ignoring that risk decisions and actions are often decided by people and organizations. Aiming at project risk management from three aspects, WBS, OBS, and RBS, this paper solves the problem of traditional risk management control, conducts comprehensive evaluation through ANP, and determines risk weight and ranking in the quantization method, in order to render risk identification more perfectly, and help decision makers to make objective and effective management decisions and distribute resources under the multi-project mode. Finally, this paper presents an application of an actual case of the aerospace industry, analyzes and solves the project risk management problems in order to verify the usability of such a method, and offers follow-up suggestions.
Keywords: Project Risk Management; Work Breakdown Structure; Organization Breakdown Structure; Risk Breakdown Structure; Analytic Network Process (search for similar items in EconPapers)
Date: 2015
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://kkgpublications.com/technology-engineering-studies-issue-4/ (application/pdf)
https://kkgpublications.com/wp-content/uploads/2019/04/IJTES-40005-4.pdf (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:apa:ijtess:2015:p:136-142
DOI: 10.20469/ijtes.40005-4
Access Statistics for this article
International Journal of Technology and Engineering Studies is currently edited by PROF.IR.DR.Mohid Jailani Mohd Nor
More articles in International Journal of Technology and Engineering Studies from PROF.IR.DR.Mohid Jailani Mohd Nor Calle Alarcon 66, Sant Adrian De Besos 08930, Barcelona Spain.
Bibliographic data for series maintained by PROF.IR.DR.Mohid Jailani Mohd Nor ().