FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects
Constanta-Nicoleta Bodea and
Augustin Purnus (purnus@utcb.ro)
Additional contact information
Augustin Purnus: Technical University of Civil Engineering of Bucharest
Juridical Tribune - Review of Comparative and International Law, 2016, vol. 6, issue 2, 165-181
Abstract:
Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.
Keywords: risk; contract; FIDIC; time; cost. (search for similar items in EconPapers)
JEL-codes: K12 K23 (search for similar items in EconPapers)
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://tribunajuridica.eu/arhiva/An6v22/12%20Bodea.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:asr:journl:v:6:y:2016:i:2:p:165-181
Access Statistics for this article
More articles in Juridical Tribune - Review of Comparative and International Law from Bucharest Academy of Economic Studies Contact information at EDIRC.
Bibliographic data for series maintained by Catalin-Silviu Sararu (catalin.sararu@tribunajuridica.eu).