Munich Airport Terminal 2 Satellite: Airport expansion under ongoing operations
Philipp Ahrens and
Matthias Stein
Journal of Airport Management, 2016, vol. 10, issue 2, 118-130
Abstract:
Airports need to match their available infrastructure to the world’s growing civil aviation sector. Most cities do not have the option of planning and constructing a new airport from scratch. Thus airport infrastructure is often extended under ongoing operations. At Munich Airport the Terminal 2 Satellite Building, a midfield terminal functioning as an expansion of the existing Terminal 2, will go into operation in April 2016, giving the airport capacity for an additional 11 million passengers per year. The construction of the Satellite building related to the subjects of building high-quality terminal infrastructure, building terminal infrastructure under ongoing operations and building terminal infrastructure with a high level of sustainability. This paper aims to give insights on these three topics. Challenges encountered during the construction are outlined, as well as the counteractions that were taken at Munich Airport. The general facts and figures of the building and additional information about specific components relevant in terms of the Satellite building’s sustainability are included. The steps taken in planning and construction of the Satellite give a perspective on other big infrastructural projects at Munich Airport and show that all challenges can be overcome with precise planning and strong organisational structures.
Keywords: Munich Airport; MUC; Munich Airport Terminal 2; Munich Airport expansion; midfield terminal; Terminal 2 Satellite; Terminal 2 Company; Joint Venture Lufthansa and Munich Airport; Lufthansa (search for similar items in EconPapers)
JEL-codes: M1 M10 R4 R40 (search for similar items in EconPapers)
Date: 2016
References: Add references at CitEc
Citations:
Downloads: (external link)
https://hstalks.com/article/1524/download/ (application/pdf)
https://hstalks.com/article/1524/ (text/html)
Requires a paid subscription for full access.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:aza:jam000:y:2016:v:10:i:2:p:118-130
Access Statistics for this article
More articles in Journal of Airport Management from Henry Stewart Publications
Bibliographic data for series maintained by Henry Stewart Talks ().