An airport in need of a step change: Geneva Airport’s Terminal Ambition Plan
André Schneider,
Joeri Aulman and
Peter Rieff
Additional contact information
André Schneider: CEO, Geneva Airport, Switzerland
Joeri Aulman: Airport Planner and Project Manager, Netherlands Airport Consultants, The Netherlands
Peter Rieff: Airport Architect, NACO, The Netherlands
Journal of Airport Management, 2021, vol. 16, issue 1, 63-76
Abstract:
Geneva Airport is embarking on a revolutionary new programme to make its Terminal facilities future proof and aligned with the changes our industry is facing. Starting with a clean slate — thinking in opportunities, not only constraints — set the fundamentals for the feasibility study on phased implementation, given COVID-19 budget constraints. The journey that the airport and its consultant NACO undertook to reach this point is worth sharing with our industry partners.
Keywords: Airport terminal; capacity; customer experience; smart phasing; operational feasibility (search for similar items in EconPapers)
JEL-codes: M1 M10 R4 R40 (search for similar items in EconPapers)
Date: 2021
References: Add references at CitEc
Citations:
Downloads: (external link)
https://hstalks.com/article/6797/download/ (application/pdf)
https://hstalks.com/article/6797/ (text/html)
Requires a paid subscription for full access.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:aza:jam000:y:2021:v:16:i:1:p:63-76
Access Statistics for this article
More articles in Journal of Airport Management from Henry Stewart Publications
Bibliographic data for series maintained by Henry Stewart Talks ().