Contamination and remediation: The impact upon a construction project
Matthew Haines
Journal of Building Survey, Appraisal & Valuation, 2014, vol. 3, issue 3, 206-215
Abstract:
A recent project suffered a six and a half week delay, with associated costs of circa £300,000 in variations. This was due to the discovery of cyanide contained within ‘blue billy’ slag materials at the site. This paper seeks to review the definition of contamination, the risks a developer faces and also the process that must be followed once such a discovery is made. The key elements reviewed relate to site selection, defining contamination, remediation, risk management and legislation.
Keywords: brownfield; contamination; remediation; risk; hazardous soil; cyanide (search for similar items in EconPapers)
JEL-codes: R3 (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:
Downloads: (external link)
https://hstalks.com/article/1457/download/ (application/pdf)
https://hstalks.com/article/1457/ (text/html)
Requires a paid subscription for full access.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:aza:jbsav0:y:2014:v:3:i:3:p:206-215
Access Statistics for this article
More articles in Journal of Building Survey, Appraisal & Valuation from Henry Stewart Publications
Bibliographic data for series maintained by Henry Stewart Talks ().