The aftermath of the Grenfell Tower fire and its relevance for construction project team members
Paul Winstone
Additional contact information
Paul Winstone: Watts Group, UK
Journal of Building Survey, Appraisal & Valuation, 2018, vol. 6, issue 4, 372-379
Abstract:
Paul Winstone gives his personal view of the Grenfell Tower aftermath and its relevance for designers and other members of the construction project team.
Keywords: Grenfell Tower; review of Building Regulations and Fire Safety; article by Paul Winstone of Watts Group Ltd (search for similar items in EconPapers)
JEL-codes: R3 (search for similar items in EconPapers)
Date: 2018
References: Add references at CitEc
Citations:
Downloads: (external link)
https://hstalks.com/article/3979/download/ (application/pdf)
https://hstalks.com/article/3979/ (text/html)
Requires a paid subscription for full access.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:aza:jbsav0:y:2018:v:6:i:4:p:372-379
Access Statistics for this article
More articles in Journal of Building Survey, Appraisal & Valuation from Henry Stewart Publications
Bibliographic data for series maintained by Henry Stewart Talks ().