EconPapers    
Economics at your fingertips  
 

PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

Severian Iacob ()

Studies and Scientific Researches. Economics Edition, 2013, issue 18

Abstract: Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

Keywords: project manager skills; risk management; project; knowledge; abilities; difficult situations (search for similar items in EconPapers)
JEL-codes: M10 (search for similar items in EconPapers)
Date: 2013
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
http://sceco.ub.ro/DATABASE/repec/pdf/2013/20131830.pdf

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:bac:fsecub:13-18-30

Access Statistics for this article

More articles in Studies and Scientific Researches. Economics Edition from "Vasile Alecsandri" University of Bacau, Faculty of Economic Sciences Contact information at EDIRC.
Bibliographic data for series maintained by Bogdan Nichifor ().

 
Page updated 2025-03-19
Handle: RePEc:bac:fsecub:13-18-30