Construction and method of assessment and research of the parameters of a load-lifting winch with a sectional disc drum
Yuriy Horbatenko and
Roman Semenchuk ()
Additional contact information
Yuriy Horbatenko: National Technical University «Igor Sikorsky Kyiv Polytechnic Institute»
Roman Semenchuk: National Technical University «Igor Sikorsky Kyiv Polytechnic Institute»
Technology audit and production reserves, 2023, vol. 1, issue 1(69), 13-17
Abstract:
The object of the study is a load-lifting winch with a sectional-disc drum for single-row multi-layer laying of flexible elements, cargo cables and power cables, during their winding, electrically protected. The winch is intended for suspension and lifting and lowering of illuminated devices and equipment in closed rooms. In the process of research (constructive development, determination and analysis of parameters), the problem of creating a winch design of the specified type with a qualitatively increased overall level of functionality is solved according to the indicators: 1) electrical insulation, compactness and necessary strength of fastening of flexible elements, lifting cables and power cables on the drum; 2) controllability of the drive: in transitional periods – to ensure smooth acceleration-stopping of the suspension; in the period of constant movement – to ensure a constant speed of the suspension during raising and lowering. Electrical insulation between the power cable, the drum and other parts of the winch is created by using parts (discs) made of synthetic insulating material, for example, fiberglass, in the construction of the drum. Clamping of flexible elements between the disks in specially profiled C-shaped ring grooves, on the ends of the hub, of the disks ensures the necessary strength and compactness of the attachment. The smoothness of starting (stopping) of the drive and the constant speed of the suspension during the period of constant movement are established by adjusting the frequency converter in the drive control system according to the parameters determined by a specially developed methodology. The obtained results, constructive solutions and methods of research (estimation and analysis) of winch parameters can be used in the design of the structure and adjustment of the control system of lifting devices of this type.
Keywords: winch; lifting equipment; sectional drum; multi-layer winding; construction of insulating winch; fastening of cargo ropes on the drum (search for similar items in EconPapers)
Date: 2023
References: Add references at CitEc
Citations:
Downloads: (external link)
https://journals.uran.ua/tarp/article/view/274692/269999 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:baq:taprar:v:1:y:2023:i:1:p:13-17
DOI: 10.15587/2706-5448.2023.274692
Access Statistics for this article
More articles in Technology audit and production reserves from PC TECHNOLOGY CENTER
Bibliographic data for series maintained by Iryna Prudius ().