Abstract:
The object of research is the technological solutions for the construction of sludge barns at the Pereschepyno field (Ukraine). One of the most problematic places is the lack of reliable insulation of sludge barns and storage facilities. The study used a screen type «wall in the soil» of elements of soil cement, which prevents the filtration of the aqueous phase. The screen was built monolithic. It is proposed to arrange the shade between the centers of the curtain equal to 0.8 of the diameter of the element. It is proposed to make elements from soil cement by the brown-mixing method. After 28 days (hardening of the elements) up to 60 % of the soil was removed from the waste storage area. This is due to the fact that the proposed method of arrangement of waste storage has a number of features. Over time, the strength and permeability of the aqueous phase of soil cement increase. It is proposed to fill the storage with drilling waste after the enclosing elements have hardened. In order for the soil to have a suitable humidity of 4–5 %, it is proposed to dry it outdoors. It is proposed to build a cover over the soil dump. If the optimum humidity of the mixture is not obtained after drying and mixing the waste with the soil, it is proposed to add a drying additive (ash removal of Mykolayiv thermal power plant). The amount of additive is from 1.5 to 3 % depending on the type of soil. Next, it is proposed to seal the layers of sludge and loam by rammers. After compaction, the operation is repeated. Compaction of soil layers is proposed to be carried out at optimum humidity. In comparison with similar known methods, this method provides the following advantages: low cost of manufacture due to the use of a waterproof layer of soil as the bottom of the structure; high water resistance – W12; high compressive strength; environmental safety and durability.
Keywords: Development; of; a; method; of; utilization; of; oil; and; gas; industry; waste; at; Pereshchepyno; field; (Ukraine) (search for similar items in EconPapers)
Date: 2022
References: Add references at CitEc
Citations:
Downloads: (external link)
https://journals.uran.ua/tarp/article/view/260548/257818 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:baq:taprar:v:3:y:2022:i:3:p:26-30
DOI: 10.15587/2706-5448.2022.260548
Access Statistics for this article
More articles in Technology audit and production reserves from PC TECHNOLOGY CENTER
Bibliographic data for series maintained by Iryna Prudius ().