Abstract:
type="main">
In equipment-intensive sectors – such as water utilities, power generation, and gas – billions of dollars are spent in capital equipment. The nature of the investment is often lumpy: at some point a plant has to be replaced and a large investment is required. We characterize the dynamic optimal investment policy of profit-maximizing and welfare-maximizing firms. We first show that, when there is no technical progress, the duration of the plant is longer for a profit-maximizing firm. We then consider technical progress leading to either capacity expansion or to operating costs reduction. We show that duration tends to increase when the installed capacity increases over time, while it tends to decrease when technical progress reduces operating costs, both for profit-maximizing and welfare-maximizing firms. Under some conditions, when capacity expands over time the duration of the plant is longer for a profit-maximizing firm than for a welfare-maximizing firm.
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1111/boer.12036 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:bla:buecrs:v:68:y:2016:i:1:p:16-33
Ordering information: This journal article can be ordered from
http://www.blackwell ... bs.asp?ref=0307-3378
Access Statistics for this article
More articles in Bulletin of Economic Research from Wiley Blackwell
Bibliographic data for series maintained by Wiley Content Delivery ().