EconPapers    
Economics at your fingertips  
 

Variable Costs and the Visible Hand: the Re‐Regulation of Electricity Supply, 1932–37

James S. Foreman‐Peck and Christopher J. Hammond
Authors registered in the RePEc Author Service: James S. Foreman-Peck

Economica, 1997, vol. 64, issue 253, 15-30

Abstract: Under an Act of 1926, a ‘public interest’ corporation, the CEB, was empowered to build a national transmission grid and rationalize UK electricity generation. A constrained cost model estimates the gains from this re‐regulation of the electricity generating industry. The new regime reduced costs by one‐third, radically improving the utilization of capital and boosting the average scale of operations. It did so by persuading private and municipal enterprises to accept central direction of the extent and timing of their electricity generation. This voluntarism saved on enforcement costs, but perhaps one‐half of the industry cost reduction the CEB actually achieved by 1937 was apparently forgone.

Date: 1997
References: Add references at CitEc
Citations:

Downloads: (external link)
https://doi.org/10.1111/1468-0335.00061

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:bla:econom:v:64:y:1997:i:253:p:15-30

Ordering information: This journal article can be ordered from
http://www.blackwell ... bs.asp?ref=0013-0427

Access Statistics for this article

Economica is currently edited by Frank Cowell, Tore Ellingsen and Alan Manning

More articles in Economica from London School of Economics and Political Science Contact information at EDIRC.
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-22
Handle: RePEc:bla:econom:v:64:y:1997:i:253:p:15-30