On the Productivity of Machines Tended by a Single Operator
A. D. Joffe
Journal of the Royal Statistical Society Series C, 1971, vol. 20, issue 2, 178-186
Abstract:
The classical machine interference problem is dealt with where the repair periods are independent Erlang variates for each service, and the running times are independent and identically distributed exponential variates for each and every machine. A simple numerical procedure has been derived from which the efficiency or productivity of the system can be calculated for any specified conditions. Some tables have been obtained of the operator efficiency for selected combinations of the variables in the problem, and it is shown that Cox's (1954) approximations work well in the particular case studied.
Date: 1971
References: Add references at CitEc
Citations:
Downloads: (external link)
https://doi.org/10.2307/2346465
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:bla:jorssc:v:20:y:1971:i:2:p:178-186
Ordering information: This journal article can be ordered from
http://ordering.onli ... 1111/(ISSN)1467-9876
Access Statistics for this article
Journal of the Royal Statistical Society Series C is currently edited by R. Chandler and P. W. F. Smith
More articles in Journal of the Royal Statistical Society Series C from Royal Statistical Society Contact information at EDIRC.
Bibliographic data for series maintained by Wiley Content Delivery ().