EconPapers    
Economics at your fingertips  
 

Chain‐Deferred Inspection Plans

P. A. Osanaiye

Journal of the Royal Statistical Society Series C, 1983, vol. 32, issue 1, 19-24

Abstract: The paper proposes plans that improve on existing chain and deferred sampling plans. The plans are mixed in the sense that they combine elements from both chained and deferred plans. This combination gives an operating characteristic curve closer to that of the traditional double sampling plan than either the simple chain or the simple deferred inspection plan when there is a trend in process quality. The plans require fewer items to be sampled than the traditional double sampling plans and have a delay in the decision only where there are indications that quality is poor. The relative ease with which these plans can be made compatible with the double sampling plans in the MIL‐STD‐105D and some other similar schemes is noted.

Date: 1983
References: Add references at CitEc
Citations:

Downloads: (external link)
https://doi.org/10.2307/2348039

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:bla:jorssc:v:32:y:1983:i:1:p:19-24

Ordering information: This journal article can be ordered from
http://ordering.onli ... 1111/(ISSN)1467-9876

Access Statistics for this article

Journal of the Royal Statistical Society Series C is currently edited by R. Chandler and P. W. F. Smith

More articles in Journal of the Royal Statistical Society Series C from Royal Statistical Society Contact information at EDIRC.
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-19
Handle: RePEc:bla:jorssc:v:32:y:1983:i:1:p:19-24