Learning Contested Lessons: Participation Equity and Electric Utility Regulation
Frank N. Laird
Review of Policy Research, 2008, vol. 25, issue 5, 429-448
Abstract:
Electric utilities have typically enjoyed a close and cooperative relationship with the state regulatory bodies that oversee them. In 2001, the Colorado Public Utilities Commission mandated that the largest Colorado utility build a wind power plant as part of its conventional generating capacity, despite the utility's vigorous objections. Local environmental groups, intervening in a form of rule making called Integrated Resource Planning, succeeded in overturning regulatory capture. This paper explains this anomalous case and highlights the role of knowledge and learning in the outcome. The case shows the opportunities and limitations of using contested technical knowledge to push for institutional learning. The case also suggests the importance of repeated policy processes. Wind energy advocates perceived that they had acquired participation equity, ownership in the process akin to Kingdon's “softening up,” which led policy makers to take their arguments more seriously, opening up the possibility of institutional learning.
Date: 2008
References: Add references at CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1111/j.1541-1338.2008.00345.x
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:bla:revpol:v:25:y:2008:i:5:p:429-448
Ordering information: This journal article can be ordered from
http://www.wiley.com/bw/subs.asp?ref=1541-132x
Access Statistics for this article
Review of Policy Research is currently edited by Christopher Gore
More articles in Review of Policy Research from Policy Studies Organization Contact information at EDIRC.
Bibliographic data for series maintained by Wiley Content Delivery ().