DYNAMIC INVESTMENT IN EXTRACTION CAPACITY OF EXHAUSTIBLE RESOURCES
Hamed Ghoddusi
Scottish Journal of Political Economy, 2010, vol. 57, issue 3, 359-373
Abstract:
This paper studies a resource extraction problem with capacity constraints, expansion options and stochastic demand process. The producer has to decide on the optimal rate of extraction and the optimal time to build further capacity simultaneously. Using numerical methods to solve the problem, it is shown that previous results which suggest that extraction capacity should be built at the beginning, are not necessarily true under uncertainty. I derive equations for the optimal time to build extra capacity. The results of this paper can contribute to better understanding of long‐run energy and commodity supply.
Date: 2010
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (6)
Downloads: (external link)
https://doi.org/10.1111/j.1467-9485.2009.00522.x
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:bla:scotjp:v:57:y:2010:i:3:p:359-373
Ordering information: This journal article can be ordered from
http://www.blackwell ... bs.asp?ref=0036-9292
Access Statistics for this article
Scottish Journal of Political Economy is currently edited by Tim Barmby, Andrew Hughes-Hallett and Campbell Leith
More articles in Scottish Journal of Political Economy from Scottish Economic Society Contact information at EDIRC.
Bibliographic data for series maintained by Wiley Content Delivery ().