Tipping point failure and robustness in single development projects

Tim Taylor and David N. Ford

System Dynamics Review, 2006, vol. 22, issue 1, 51-71

Abstract: Tipping point feedback structures can push a series of product development projects into fire‐fighting mode in which rework overwhelms progress. Similar dynamics also threaten the performance of individual development projects. The current work extends previous tipping point dynamics research to single projects and demonstrates how a simple, common feedback structure can cause complex tipping point dynamics, trap projects in deteriorating modes of behavior, and cause projects to fail. Basic tipping point dynamics in single projects are described, demonstrated, and analyzed with a model. The concept of applying robustness to project design is preliminarily tested and system robustness to tipping point‐induced failure is quantified for a simple project and analyzed with sensitivity analysis. Impacts of tipping points on project performance and future research opportunities concerning tipping point and robustness in project management are discussed. Copyright © 2006 John Wiley & Sons, Ltd.

Date: 2006
References: Add references at CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
https://doi.org/10.1002/sdr.330

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:bla:sysdyn:v:22:y:2006:i:1:p:51-71

Ordering information: This journal article can be ordered from
http://www.blackwell ... bs.asp?ref=0883-7066

Access Statistics for this article

More articles in System Dynamics Review from System Dynamics Society
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-19
Handle: RePEc:bla:sysdyn:v:22:y:2006:i:1:p:51-71