BUILDING THE PROJECT TEAM AND PROJECT ORGANIZATION – CHALLENGES AND OBSTACLES
Dumitru Troanca ()
Studies in Business and Economics, 2011, vol. 6, issue 3, 186-195
Abstract:
The building of a project team can be one of the first hurdles the future team manager faces. The blame for this can be constraints in terms of resources to fund salaries, lack of adequate or properly trained personnel, unavailability of specialists the manager needs within the project in the period this is scheduled, but also other causes. The building of a project team process must also correlated with its future structure, the two components influencing each other in both directions. Choosing an appropriate structure for the project to be implemented is not only necessary, but, moreover, may prove fatal to the extent that is not obtained.
Keywords: projects; project management; project team; classical structures; matrix organization (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations:
Downloads: (external link)
http://eccsf.ulbsibiu.ro/RePEc/blg/journl/6314troanca.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:blg:journl:v:6:y:2011:i:3:p:186-195
Access Statistics for this article
More articles in Studies in Business and Economics from Lucian Blaga University of Sibiu, Faculty of Economic Sciences Lucian Blaga University of Sibiu, Faculty of Economic Sciences Dumbravii Avenue, No 17, postal code 550324, Sibiu, Romania. Contact information at EDIRC.
Bibliographic data for series maintained by Mihaela Herciu ().