Using of simulation in project management
VYUŽITÍ SIMULACE V PROJEKTOVÉM MANAGEMENTU
Jana Friebelová and
Ludvík Friebel
Additional contact information
Jana Friebelová: University of South Bohemia in České Budějovice
Ludvík Friebel: University of South Bohemia in České Budějovice
Acta Universitatis Bohemiae Meridionalis, 2007, vol. 10, issue 1, 5-9
Abstract:
The duration of all or some activities in stochastic projects is a random variable. It is advantageous to generate values of random activity durations with beta probability distributions. We can carry out time analysis of stochastic projects by means of simulation.
Keywords: stochastic project; a random activity duration; beta probability distribution; simulation; @RISK (search for similar items in EconPapers)
Date: 2007
References: Add references at CitEc
Citations:
Downloads: (external link)
http://acta.ef.jcu.cz/doi/10.32725/acta.2007.001.html (text/html)
http://acta.ef.jcu.cz/doi/10.32725/acta.2007.001.pdf (application/pdf)
free of charge
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:boh:actaub:v:10:y:2007:i:1:p:5-9
DOI: 10.32725/acta.2007.001
Access Statistics for this article
Acta Universitatis Bohemiae Meridionalis is currently edited by Tereza Šťástková
More articles in Acta Universitatis Bohemiae Meridionalis from University of South Bohemia in Ceske Budejovice, Faculty of Economics Contact information at EDIRC.
Bibliographic data for series maintained by Ivo Andrle ().