EconPapers    
Economics at your fingertips  
 

A Note on the Continuous Sampling Plan CSP-V

Chen Chung-Ho and Chou Chao-Yu
Additional contact information
Chen Chung-Ho: Department of Industrial Management, Southern Taiwan University of Technology, 1 Nan-Tai Street, Yung-Kang City, Tainan 710, Taiwan
Chou Chao-Yu: Department of Industrial Engineering and Management, National Yunlin University of Science and Technology, Touliu 640, Taiwan

Stochastics and Quality Control, 2002, vol. 17, issue 2, 235-239

Abstract: This note investigates the problem of minimizing the average fraction inspected (AFI) for a CSP – V plan. A solution procedure is developed to find the sampling plan parameters that meet the average outgoing quality limit (AOQL) requirement, while minimizing the AFI when the process average (> AOQL) is known.

Keywords: Continuous Sampling Plan; Average Outgoing Quality (AOQ); Average Outgoing Quality Limit (AOQL); Average Fraction Inspected (AFI) (search for similar items in EconPapers)
Date: 2002
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://doi.org/10.1515/EQC.2002.235 (text/html)
For access to full text, subscription to the journal or payment for the individual article is required.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:bpj:ecqcon:v:17:y:2002:i:2:p:235-239:n:8

Ordering information: This journal article can be ordered from
https://www.degruyter.com/journal/key/eqc/html

DOI: 10.1515/EQC.2002.235

Access Statistics for this article

Stochastics and Quality Control is currently edited by George P. Yanev

More articles in Stochastics and Quality Control from De Gruyter
Bibliographic data for series maintained by Peter Golla ().

 
Page updated 2025-03-19
Handle: RePEc:bpj:ecqcon:v:17:y:2002:i:2:p:235-239:n:8