Delayed-Bang Approach Towards More Sustainable Critical Infrastructure Risk Management
Pinto C. Ariel,
McShane Michael K and
Pathak Abhishek S
Additional contact information
Pinto C. Ariel: Old Dominion University
McShane Michael K: Old Dominion University
Pathak Abhishek S: Old Dominion University
Journal of Homeland Security and Emergency Management, 2011, vol. 8, issue 1, 17
Abstract:
This article describes the Delayed Bang Approach for determining the value of risk management alternatives in critical infrastructure security. The discussion includes (1) the need for sustainable risk management (2) the importance of time valuation in evaluating competing loss prevention and loss reduction alternatives, (3) the convergence of deterministic engineering economics, survivability analysis , and probabilistic analysis, and (4) hypothetical examples of the Delayed-Bang Approach and significance towards more sustainable risk management.
Keywords: risk management; critical infrastructure; security; engineering economy; cost-benefit analysis (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations:
Downloads: (external link)
https://doi.org/10.2202/1547-7355.1533 (text/html)
For access to full text, subscription to the journal or payment for the individual article is required.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:bpj:johsem:v:8:y:2011:i:1:p:17:n:11
Ordering information: This journal article can be ordered from
https://www.degruyter.com/journal/key/jhsem/html
DOI: 10.2202/1547-7355.1533
Access Statistics for this article
Journal of Homeland Security and Emergency Management is currently edited by Irmak Renda-Tanali
More articles in Journal of Homeland Security and Emergency Management from De Gruyter
Bibliographic data for series maintained by Peter Golla ().