INVESTIGATING THE POTENTIALS OF FAST TRACK IN MITIGATING PROJECT ABANDONMENT: CASE STUDIES

Amir Hassin B.Baharuddin, Abdulhamid Kadir Pakir, Abdelnaser Omran and Ibrahim Ado Wudil
Additional contact information
Amir Hassin B.Baharuddin: Universitri Sains Malaysia
Abdulhamid Kadir Pakir: Universitri Sains Malaysia
Abdelnaser Omran: Universitri Sains Malaysia
Ibrahim Ado Wudil: Universitri Sains Malaysia

Manager Journal, 2011, vol. 14, issue 1, 123-138

Abstract: The construction industry plays a very role in the fixed capital formation of any economy. Thus, the activities of construction in any economy, mirrors its general performance; a healthy economy usually experiences an upward swing in construction activities and a depressed economy indicates the reverse. But, project abandonment has been posing a threat to so many countries in their march towards the achievement of the above economic independence and greater civilization, and Nigeria is no exception. We have road and other construction projects that have taken ages in building, whose completion date is only in the imagination of the gods. Governments succeed governments and waste many months reviewing contracts and on-going projects, and re-awarding contracts. The ritual has come to stay and public funds are sunk into projects whose viability, usefulness, and urgency remain doubtful; then they are abandonment. However, majority of project abandonment could be traced to longer project duration. This is because the longer the duration of a project the more additional costs to the project through variations, inflations, and other expenses associated with time (time related to expenses). Time consumed by project directly influence the cost incurred on a project. When these traditional costs are too much, they lead to the client’s budget for the project to be exceeded. And when clients can no longer entertain those additional costs, it becomes a subject of disputes, and eventually the project is abandoned. As such, there is the need for the construction industry participants to embrace an efficient and effective means of minimizing projects’ duration in order to minimize the occurrences of project abandonment; and Fast Track procurement method is one good project management tool that have been in used to meet these challenges of time and cost.

Keywords: Fast track; Mitigation; Project Abandonment; Nigeria (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations:

Downloads: (external link)
http://manager.faa.ro/download/664_1412.pdf (application/pdf)
http://manager.faa.ro/en/article/The-public-spendi ... blic-sector~635.html (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:but:manage:v:14:y:2011:i:1:p:123-138

Access Statistics for this article

Manager Journal is currently edited by Paul Marinescu

More articles in Manager Journal from Faculty of Business and Administration, University of Bucharest Contact information at EDIRC.
Bibliographic data for series maintained by Cosmin Catalin Olteanu ().

 
Page updated 2025-03-19
Handle: RePEc:but:manage:v:14:y:2011:i:1:p:123-138