Non-exécution du contrat: le choix de l'arbitrage
Nathalie Chappe
Revue d'économie industrielle, 2010, vol. n° 131, issue 3, 9-24
Abstract:
We propose a comparison between the expectation measure and arbitration as remedy for inadvertent breach of contract. Our framework is borrowed from Bebchuk and Png (1999). Our key result is that an arbitration clause could be more efficient than court-imposed damage remedies.
Keywords: Arbitration; Breach of Contract; Litigation (search for similar items in EconPapers)
Date: 2010
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.cairn.info/load_pdf.php?ID_ARTICLE=REI_131_0009 (application/pdf)
http://www.cairn.info/revue-d-economie-industrielle-2010-3-page-9.htm (text/html)
free
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cai:reidbu:rei_131_0009
Access Statistics for this article
More articles in Revue d'économie industrielle from De Boeck Université
Bibliographic data for series maintained by Jean-Baptiste de Vathaire ().