Delays in public investment projects
Raphael Espinoza and
Andrea Presbitero
International Economics, 2022, issue 172, 297-310
Abstract:
The returns from public investment, especially during periods of scaling up, are often lower than expected. To understand the mechanisms behind this regularity we exploit original information on investment projects obtained from World Bank project reports to document the extent and the drivers of time delays in project implementation. We find that almost 60 percent of investment projects are delayed by at least one year. Time overruns are common across sectors and countries. A sound planning and preparation matter for the timing of project execution. Country characteristics also play a role, as projects undertaken in countries with weaker institutions and in periods of public investment scaling up are completed with longer delays.
Keywords: Public investment; Time delays; Investment projects; World bank; Investment scaling up (search for similar items in EconPapers)
JEL-codes: H43 H54 O12 O22 (search for similar items in EconPapers)
Date: 2022
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.sciencedirect.com/science/article/pii/S211070172100069X (text/html)
Related works:
Journal Article: Delays in public investment projects (2022)
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cii:cepiie:2022-q3-172-21
Access Statistics for this article
More articles in International Economics from CEPII research center Contact information at EDIRC.
Bibliographic data for series maintained by ().