Making a Short Story Long: The Construction of the Suez–Mediterranean Oil Pipeline in Egypt, 1967–1977
Elie Podeh
Business History Review, 2004, vol. 78, issue 1, 61-88
Abstract:
The idea to construct a pipeline from Suez to the Mediterranean (SUMED) was initially raised before the 1967 War. With the closure of the Suez Canal following the war, the pipeline could offer a less expensive route for Gulf oil. However, the pipeline was inaugurated only in 1977, following three wars and debilitating negotiations between Egypt and foreign institutions. This article analyzes the motives for the project as well as the reasons for the long delay in its implementation. Anticipated financial profits were a major consideration for both the governments concerned and the oil companies. Yet the project was launched only after the parties involved realized that its construction also entailed significant political advantages and after the security risks were eliminated. In recent years, SUMED and the Suez Canal have become major transportation routes for crude oil, transforming Egypt into an actor in the oil market.
Date: 2004
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.cambridge.org/core/product/identifier/ ... type/journal_article link to article abstract page (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cup:buhirw:v:78:y:2004:i:01:p:61-88_04
Access Statistics for this article
More articles in Business History Review from Cambridge University Press Cambridge University Press, UPH, Shaftesbury Road, Cambridge CB2 8BS UK.
Bibliographic data for series maintained by Kirk Stebbing ().