EconPapers    
Economics at your fingertips  
 

When the Complexity of the Large-Scale Development Project Becomes a Roadblock to Access to Justice

Pillkyu Hwang and Yae-Ahn Park

Business and Human Rights Journal, 2021, vol. 6, issue 3, 592-598

Abstract: On 23 July 2018, when the villagers gathered around the porch to wrap up the day with a good chat, one of the five auxiliary dams of the Xe-Pian Xe-Namnoy hydropower dam in Attapeu province, the southeastern state of Laos, collapsed. Four days before the collapse, reports of cracks and subsidence started to come through. It should have been enough to prompt evacuation warning issuance by the Xe-Pian Xe-Namnoy Power Co. Ltd (PNPC), a consortium of South Korean companies SK Engineering and Construction (SK E&C) and Korea Western Power Company (KOWEPO), Thailand-based RATCH Group, and Lao Holding State Enterprise (LHSE). PNPC has a Concession Agreement with the Laos government ‘to plan, design, finance, construct, own, operate and maintain’ the Xe-Pian Xe-Namnoy hydropower dam. The warning was issued, but it came too late.

Date: 2021
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.cambridge.org/core/product/identifier/ ... type/journal_article link to article abstract page (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:cup:buhurj:v:6:y:2021:i:3:p:592-598_12

Access Statistics for this article

More articles in Business and Human Rights Journal from Cambridge University Press Cambridge University Press, UPH, Shaftesbury Road, Cambridge CB2 8BS UK.
Bibliographic data for series maintained by Kirk Stebbing ().

 
Page updated 2025-03-19
Handle: RePEc:cup:buhurj:v:6:y:2021:i:3:p:592-598_12