EconPapers    
Economics at your fingertips  
 

Where Have We Been, How Did We Get There, and Where Shall We Go?

Charles E. Lance

Industrial and Organizational Psychology, 2008, vol. 1, issue 1, 140-146

Abstract: Commentators expressed a wide variety of views on my evaluation of the state of assessment center (AC) research and practice. In this response, I first trace the evolution of the construct validity paradox “urban legend.” Next, I consider the commentators’ comments as they relate to (a) my recommendation to abandon dimension-based ACs in lieu of task- or role-based structures (b) my recommendation to discontinue design fix attempts toward making ACs conform to multitrait–multimethod construct validity criteria, and (c) considerations of construct validity and validation evidence. Finally, I offer some directions for future AC research and practice.

Date: 2008
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.cambridge.org/core/product/identifier/ ... type/journal_article link to article abstract page (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:cup:inorps:v:1:y:2008:i:01:p:140-146_00

Access Statistics for this article

More articles in Industrial and Organizational Psychology from Cambridge University Press Cambridge University Press, UPH, Shaftesbury Road, Cambridge CB2 8BS UK.
Bibliographic data for series maintained by Kirk Stebbing ().

 
Page updated 2025-03-19
Handle: RePEc:cup:inorps:v:1:y:2008:i:01:p:140-146_00