EconPapers    
Economics at your fingertips  
 

The most appropriate discount rate

David F. Burgess and Richard O. Zerbe

Journal of Benefit-Cost Analysis, 2013, vol. 4, issue 3, 391-400

Abstract: The social opportunity cost of capital discount rate is the appropriate discount rate to use when evaluating government projects. It satisfies the fundamental rule that no project should be accepted that has a rate of return less than alternative available projects, and it ensures that worthy projects satisfy the potential Pareto test. The social time preference approach advocated by Moore et al. fails to satisfy either of these criteria even in the unlikely case that the private sector behaves myopically with respect to a project’s future benefits and costs.

Date: 2013
References: Add references at CitEc
Citations: View citations in EconPapers (12)

Downloads: (external link)
https://www.cambridge.org/core/product/identifier/ ... type/journal_article link to article abstract page (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:cup:jbcoan:v:4:y:2013:i:03:p:391-400_00

Access Statistics for this article

More articles in Journal of Benefit-Cost Analysis from Cambridge University Press Cambridge University Press, UPH, Shaftesbury Road, Cambridge CB2 8BS UK.
Bibliographic data for series maintained by Kirk Stebbing ().

 
Page updated 2025-03-19
Handle: RePEc:cup:jbcoan:v:4:y:2013:i:03:p:391-400_00