Ex ante and ex post cost estimates of the Cluster Rule and MACT II Rule
Cynthia Morgan,
Carl Pasurka and
Ron Shadbegian
Journal of Benefit-Cost Analysis, 2014, vol. 5, issue 2, 195-224
Abstract:
This paper compares EPA’s ex ante cost analysis of the Cluster Rule, EPA’s first integrated, multi-media regulation, and MACT II Rule to an ex post cost assessment. The goal of this assessment is to determine if actual costs diverged from ex ante costs and, if so, what factors caused this divergence. We find the EPA ex ante costs overestimated the ex post capital costs for the Cluster Rule by 30 to 100%. Contributing factors appear to be use of cleaner technology, flexible compliance options, site-specific rules, shutdowns and consolidations. Ex ante estimates for the MACT II Rule are found to be overestimated by 25% for capital costs and 200 or more percent for annual costs. The primary reason for the overestimate is the use of the bubble compliance strategy that required fewer paper mills to install pollution abatement equipment than anticipated by EPA.
Date: 2014
References: Add references at CitEc
Citations: View citations in EconPapers (6)
Downloads: (external link)
https://www.cambridge.org/core/product/identifier/ ... type/journal_article link to article abstract page (text/html)
Related works:
Journal Article: Ex ante and ex post cost estimates of the Cluster Rule and MACT II Rule (2014) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cup:jbcoan:v:5:y:2014:i:02:p:195-224_00
Access Statistics for this article
More articles in Journal of Benefit-Cost Analysis from Cambridge University Press Cambridge University Press, UPH, Shaftesbury Road, Cambridge CB2 8BS UK.
Bibliographic data for series maintained by Kirk Stebbing ().