On Optimal Asset Abandonment and Replacement
Keith M. Howe and
George M. McCabe
Journal of Financial and Quantitative Analysis, 1983, vol. 18, issue 3, 295-305
Abstract:
Numerous studies in recent years have emphasized the importance of accounting properly for abandoment value in capital budgeting (see [1], [4], [7], [10], and [11]). For a variety of reasons, a project need be neither physically exhausted nor have negative cash flows to be abandoned. Robichek and Van Home [10] suggested that a project should be abandoned in any period in which the present value of future cash flows does not exceed its abandonment value. In a modification of this rule, Dyl and Long [4] proposed that the firm give consideration to all possible future abandonment opportunities. They argued that abandonment need not occur at the earliest possible date that the abandonment condition is satisfied, but rather at the date that yields the highest NPV over all future abandonment possibilities. A generalization of these models was offered by Bonini [1], who developed a dynamic programming model to analyze investment projects with abandonment possibilities and uncertain cash flows. More recently, Gaumnitz and Emery [7] compared the abandonment decision to the like-for-like replacement decision and noted that the correct model for a particular case depends on the suitability of the assumptions.
Date: 1983
References: Add references at CitEc
Citations: View citations in EconPapers (7)
Downloads: (external link)
https://www.cambridge.org/core/product/identifier/ ... type/journal_article link to article abstract page (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cup:jfinqa:v:18:y:1983:i:03:p:295-305_01
Access Statistics for this article
More articles in Journal of Financial and Quantitative Analysis from Cambridge University Press Cambridge University Press, UPH, Shaftesbury Road, Cambridge CB2 8BS UK.
Bibliographic data for series maintained by Kirk Stebbing ().